The waterfall model is argued by many to be a bad idea in practice, mainly because of their belief that it is impossible, for any non-trivial project, to get one phase of a software product's lifecycle "perfected" before moving on to the next phases and learning from them. For example, clients may not be aware of exactly what requirements they want before they see a working prototype and can comment upon it; they may change their requirements constantly, and program designers and implementers may have little control over this. If clients change their requirements after a design is finished, that design must be modified to accommodate the new requirements, invalidating quite a good deal of effort if overly large amounts of time have been invested into "Big Design Up Front". Designers may not be aware of future implementation difficulties when writing a design for an unimplemented software product. That is, it may become clear in the implementation phase that a particular area of program functionality is extraordinarily difficult to implement. If this is the case, it is better to revise the design than to persist in using a design that was made based on faulty predictions and that does not account for the newly discovered problem areas.
Steve McConnell in Code Complete (a book which criticizes the widespread use of the waterfall model) refers to design as a "wicked problem" - a problem whose requirements and limitations cannot be entirely known before completion. The implication is that it is impossible to get one phase of software development "perfected" before time is spent in "reconnaissance" working out exactly where and what the big problems are.
Additional criticisms of a non-iterative development approach (such as the waterfall model) include:

  • Unless those who specify requirements and those who design the software system in question are highly competent, it is difficult to know exactly what is needed in each phase of the software process before some time is spent in the phase "following" it. That is, feedback from following phases is needed to complete "preceding" phases satisfactorily. For example, the design phase may need feedback from the implementation phase to identify problem design areas. The counter-argument for the waterfall model is that experienced designers may have worked on similar systems before, and so may be able to accurately predict problem areas without time spent prototyping and implementing.

  • Constant testing from the design, implementation and verification phases is required to validate the phases preceding them. Constant "prototype design" work is needed to ensure that requirements are non-contradictory and possible to fulfill; constant implementation is needed to find problem areas and inform the design process; constant integration and verification of the implemented code is necessary to ensure that implementation remains on track. The counter-argument for the waterfall model here is that constant implementation and testing to validate the design and requirements is only needed if the introduction of bugs is likely to be a problem. Users of the waterfall model may argue that if designers (et cetera) follow a disciplined process and do not make mistakes that there is no need for constant work in subsequent phases to validate the preceding phases.

  • Frequent incremental builds (following the "release early, release often" philosophy) are often needed to build confidence for a software production team and their client.

  • It is difficult to estimate time and cost for each phase of the development process without doing some "recon" work in that phase, unless those estimating time and cost are highly experienced with the type of software product in question.

  • The waterfall model brings no formal means of exercising management control over a project and planning control and risk management are not covered within the model itself.

  • Very specific skill sets are required for each phase, thus there is a requirement for multiple projects to run in sequence to optimize resource use if all members stay through the course of a given project, or to suffer skill levels by using "jack of all trades" resources throughout each stage.