A number of project management tools are specifically aimed at agile development. They are designed to help plan, track, analyse and integrate work. These tools play an important role in agile development, as a means of Knowledge Management.
Common features include: Version control integration, progress tracking, easy work allocation, integrated release and iteration planning, discussion forums, and reporting and tracking of software defects
Some well-known agile project management websites include: Rally Software, versionone, TargetProcess, assembla, acunote, ppts, Mingle, Gatherspace and visionproject.
.
Agile methods and project management
Agile methods differ to a large degree in the way they cover project management. Some methods are supplemented with guidelines on project management, but there is generally no comprehensive support.
PRINCE2 has been suggested as a suitable, complementary project management system.
PRINCE2 has been suggested as a suitable, complementary project management system.
Agile methods and method tailoring
In the literature, different terms refer to the notion of method adaptation, including ‘method tailoring’, ‘method fragment adaptation’ and ‘situational method engineering’. Method tailoring is defined as:
A process or capability in which human agents through responsive changes in, and dynamic interplays between contexts, intentions, and method fragments determine a system development approach for a specific project situation.
Potentially, almost all agile methods are suitable for method tailoring. Even the DSDM method is being used for this purpose and has been successfully tailored in a CMM context.
Situation-appropriateness can be considered as a distinguishing characteristic between agile methods and traditional software development methods, with the latter being relatively much more rigid and prescriptive. The practical implication is that agile methods allow project teams to adapt working practices according to the needs of individual projects. Practices are concrete activities and products that are part of a method framework. At a more extreme level, the philosophy behind the method, consisting of a number of principles, could be adapted (Aydin, 2004).
XP makes the need for method adaptation explicit. One of the fundamental ideas of XP is that no one process fits every project, but rather that practices should be tailored to the needs of individual projects. There are no experience reports in which all the XP practices have been adopted. Instead, a partial adoption of XP practices, as suggested by Beck, has been reported on several occasions.
A distinction can be made between static method adaptation and dynamic method adaptation. The key assumption behind static method adaptation is that the project context is given at the start of a project and remains fixed during project execution. The result is a static definition of the project context. Given such a definition, route maps can be used in order to determine which structured method fragments should be used for that particular project, based on predefined sets of criteria. Dynamic method adaptation, in contrast, assumes that projects are situated in an emergent context. An emergent context implies that a project has to deal with emergent factors that affect relevant conditions but are not predictable. This also means that a project context is not fixed, but changing during project execution. In such a case prescriptive route maps are not appropriate. The practical implication of dynamic method adaptation is that project managers often have to modify structured fragments or even innovate new fragments, during the execution of a project (Aydin et al, 2005).
A process or capability in which human agents through responsive changes in, and dynamic interplays between contexts, intentions, and method fragments determine a system development approach for a specific project situation.
Potentially, almost all agile methods are suitable for method tailoring. Even the DSDM method is being used for this purpose and has been successfully tailored in a CMM context.
Situation-appropriateness can be considered as a distinguishing characteristic between agile methods and traditional software development methods, with the latter being relatively much more rigid and prescriptive. The practical implication is that agile methods allow project teams to adapt working practices according to the needs of individual projects. Practices are concrete activities and products that are part of a method framework. At a more extreme level, the philosophy behind the method, consisting of a number of principles, could be adapted (Aydin, 2004).
XP makes the need for method adaptation explicit. One of the fundamental ideas of XP is that no one process fits every project, but rather that practices should be tailored to the needs of individual projects. There are no experience reports in which all the XP practices have been adopted. Instead, a partial adoption of XP practices, as suggested by Beck, has been reported on several occasions.
A distinction can be made between static method adaptation and dynamic method adaptation. The key assumption behind static method adaptation is that the project context is given at the start of a project and remains fixed during project execution. The result is a static definition of the project context. Given such a definition, route maps can be used in order to determine which structured method fragments should be used for that particular project, based on predefined sets of criteria. Dynamic method adaptation, in contrast, assumes that projects are situated in an emergent context. An emergent context implies that a project has to deal with emergent factors that affect relevant conditions but are not predictable. This also means that a project context is not fixed, but changing during project execution. In such a case prescriptive route maps are not appropriate. The practical implication of dynamic method adaptation is that project managers often have to modify structured fragments or even innovate new fragments, during the execution of a project (Aydin et al, 2005).
Agile Data
The Agile Data method describes how data professionals can be productive members of agile software development teams. Agile Data's 6 philosophies provide guidance for how data professionals can interact effectively with other team members as traditional approaches to data work don't fit well with agile approaches. More importantly the Agile Data method describes a collection of agile techniques that DBAs can adopt, including Database refactoring, agile data modeling, database regression testing, and continuous database integration.
Suitability of agile methods
There is little if any consensus on what types of software projects are best suited for agile methodologies. Many large organizations have difficulty bridging the gap between a more traditional waterfall method and an agile one.
Large scale agile software development remains an active research area.
Agile development has been widely documented (see Experience Reports, below, as well as Beck , and Boehm and Turner as working well for small (<10 developers) co-located teams.
Some things that can negatively impact the success of an agile project are:
Large scale development efforts (>20 developers), though scaling strategiesand evidence to the contrary have been described.
Distributed development efforts (non-co-located teams). Strategies have been described in Bridging the Distance and Using an Agile Software Process with Offshore DevelopmentCommand-and-control company cultures
Forcing an agile process on a development team
Several successful large scale agile projects have been documented. BT has had several hundred developers situated in the UK, Ireland and India working collaboratively on projects and using Agile methods. While questions undoubtedly still arise about the suitability of some Agile methods to certain project types, it would appear that scale or geography, by themselves, are not necessarily barriers to success.
Barry Boehm and Richard Turner suggest that risk analysis be used to choose between adaptive ("agile") and predictive ("plan-driven") methods.The authors suggest that each side of the continuum has its own home ground as follows:
Agile home ground:
- Low criticality
- Senior developers
- Requirements change very often
- Small number of developers
- Culture that thrives on chaos
- Plan-driven home ground:
- High criticality
- Junior developers
- Requirements don't change too often
- Large number of developers
- Culture that demands order
Large scale agile software development remains an active research area.
Agile development has been widely documented (see Experience Reports, below, as well as Beck , and Boehm and Turner as working well for small (<10 developers) co-located teams.
Some things that can negatively impact the success of an agile project are:
Large scale development efforts (>20 developers), though scaling strategiesand evidence to the contrary have been described.
Distributed development efforts (non-co-located teams). Strategies have been described in Bridging the Distance and Using an Agile Software Process with Offshore DevelopmentCommand-and-control company cultures
Forcing an agile process on a development team
Several successful large scale agile projects have been documented. BT has had several hundred developers situated in the UK, Ireland and India working collaboratively on projects and using Agile methods. While questions undoubtedly still arise about the suitability of some Agile methods to certain project types, it would appear that scale or geography, by themselves, are not necessarily barriers to success.
Barry Boehm and Richard Turner suggest that risk analysis be used to choose between adaptive ("agile") and predictive ("plan-driven") methods.The authors suggest that each side of the continuum has its own home ground as follows:
Agile home ground:
- Low criticality
- Senior developers
- Requirements change very often
- Small number of developers
- Culture that thrives on chaos
- Plan-driven home ground:
- High criticality
- Junior developers
- Requirements don't change too often
- Large number of developers
- Culture that demands order
Agile Comparison with other methods
Agile methods are sometimes characterized as being at the opposite end of the spectrum from "plan-driven" or "disciplined" methods. This distinction is misleading, as it implies that agile methods are "unplanned" or "undisciplined". A more accurate distinction is that methods exist on a continuum from "adaptive" to "predictive". Agile methods lie on the "adaptive" side of this continuum.
Adaptive methods focus on adapting quickly to changing realities. When the needs of a project change, an adaptive team changes as well. An adaptive team will have difficulty describing exactly what will happen in the future. The further away a date is, the more vague an adaptive method will be about what will happen on that date. An adaptive team can report exactly what tasks are being done next week, but only which features are planned for next month. When asked about a release six months from now, an adaptive team may only be able to report the mission statement for the release, or a statement of expected value vs. cost.
Predictive methods, in contrast, focus on planning the future in detail. A predictive team can report exactly what features and tasks are planned for the entire length of the development process. Predictive teams have difficulty changing direction. The plan is typically optimized for the original destination and changing direction can cause completed work to be thrown away and done over differently. Predictive teams will often institute a change control board to ensure that only the most valuable changes are considered.
Agile methods have much in common with the "Rapid Application Development" techniques from the 1980/90s as espoused by James Martin and others.
Contrasted with other iterative development methods
Most agile methods share other iterative and incremental development methods' emphasis on building releasable software in short time periods. Agile development differs from other development models: in this model time periods are measured in weeks rather than months and work is performed in a highly collaborative manner. Most agile methods also differ by treating their time period as a strict timebox.
Contrasted with the waterfall model
Agile development has little in common with the waterfall model. As of 2008, the waterfall model is still in common use. The waterfall model is the most predictive of the methods, stepping through requirements capture, analysis, design, coding, and testing in a strict, pre-planned sequence. Progress is generally measured in terms of deliverable artifacts: requirement specifications, design documents, test plans, code reviews and the like.
The main problem with the waterfall model is the inflexible division of a project into separate stages, so that commitments are made early on, and it is difficult to react to changes in requirements. Iterations are expensive. This means that the waterfall model is likely to be unsuitable if requirements are not well understood or are likely to change in the course of the project.
Agile methods, in contrast, produce completely developed and tested features (but a very small subset of the whole) every few weeks or months. The emphasis is on obtaining the smallest workable piece of functionality to deliver business value early, and continually improving it/adding further functionality throughout the life of the project.
In this respect, agile critics incorrectly assert that these features are not placed in context of the overall project, concluding that, if the sponsors of the project are concerned about completing certain goals with a defined timeline or budget, agile may not be appropriate. Adaptations of Scrum show how agile methods are augmented to produce and continuously improve a strategic plan.
Some agile teams use the waterfall model on a small scale, repeating the entire waterfall cycle in every iteration.Other teams, most notably Extreme Programming teams, work on activities simultaneously.
Contrasted with "cowboy coding"
Cowboy coding is the absence of a defined method: team members do whatever they feel is right. Agile development's frequent re-evaluation of plans, emphasis on face-to-face communication, and relatively sparse use of documents sometimes causes people to confuse it with cowboy coding. Agile teams, however, do follow defined (and often very disciplined and rigorous) processes.
As with all development methods, the skill and experience of the users determine the degree of success and/or abuse of such activity. The more rigid controls systematically embedded within a process offer stronger levels of accountability of the users. The degradation of well-intended procedures can lead to activities often categorized as cowboy coding.
Adaptive methods focus on adapting quickly to changing realities. When the needs of a project change, an adaptive team changes as well. An adaptive team will have difficulty describing exactly what will happen in the future. The further away a date is, the more vague an adaptive method will be about what will happen on that date. An adaptive team can report exactly what tasks are being done next week, but only which features are planned for next month. When asked about a release six months from now, an adaptive team may only be able to report the mission statement for the release, or a statement of expected value vs. cost.
Predictive methods, in contrast, focus on planning the future in detail. A predictive team can report exactly what features and tasks are planned for the entire length of the development process. Predictive teams have difficulty changing direction. The plan is typically optimized for the original destination and changing direction can cause completed work to be thrown away and done over differently. Predictive teams will often institute a change control board to ensure that only the most valuable changes are considered.
Agile methods have much in common with the "Rapid Application Development" techniques from the 1980/90s as espoused by James Martin and others.
Contrasted with other iterative development methods
Most agile methods share other iterative and incremental development methods' emphasis on building releasable software in short time periods. Agile development differs from other development models: in this model time periods are measured in weeks rather than months and work is performed in a highly collaborative manner. Most agile methods also differ by treating their time period as a strict timebox.
Contrasted with the waterfall model
Agile development has little in common with the waterfall model. As of 2008, the waterfall model is still in common use. The waterfall model is the most predictive of the methods, stepping through requirements capture, analysis, design, coding, and testing in a strict, pre-planned sequence. Progress is generally measured in terms of deliverable artifacts: requirement specifications, design documents, test plans, code reviews and the like.
The main problem with the waterfall model is the inflexible division of a project into separate stages, so that commitments are made early on, and it is difficult to react to changes in requirements. Iterations are expensive. This means that the waterfall model is likely to be unsuitable if requirements are not well understood or are likely to change in the course of the project.
Agile methods, in contrast, produce completely developed and tested features (but a very small subset of the whole) every few weeks or months. The emphasis is on obtaining the smallest workable piece of functionality to deliver business value early, and continually improving it/adding further functionality throughout the life of the project.
In this respect, agile critics incorrectly assert that these features are not placed in context of the overall project, concluding that, if the sponsors of the project are concerned about completing certain goals with a defined timeline or budget, agile may not be appropriate. Adaptations of Scrum show how agile methods are augmented to produce and continuously improve a strategic plan.
Some agile teams use the waterfall model on a small scale, repeating the entire waterfall cycle in every iteration.Other teams, most notably Extreme Programming teams, work on activities simultaneously.
Contrasted with "cowboy coding"
Cowboy coding is the absence of a defined method: team members do whatever they feel is right. Agile development's frequent re-evaluation of plans, emphasis on face-to-face communication, and relatively sparse use of documents sometimes causes people to confuse it with cowboy coding. Agile teams, however, do follow defined (and often very disciplined and rigorous) processes.
As with all development methods, the skill and experience of the users determine the degree of success and/or abuse of such activity. The more rigid controls systematically embedded within a process offer stronger levels of accountability of the users. The degradation of well-intended procedures can lead to activities often categorized as cowboy coding.
Agile
Agile software development refers to a group of software development methodologies that promotes development iterations, open collaboration, and process adaptability throughout the life-cycle of the project.
Agile methods are a family of development processes, not a single approach to software development. In 2001, 17 prominent figures[5] in the field of agile development (then called "light-weight methods") came together at the Snowbird ski resort in Utah to discuss ways of creating software in a lighter, faster, more people-centric way. They created the Agile Manifesto, widely regarded as the canonical definition of agile development and accompanying agile principles.
Some of the principles behind the Agile Manifesto[6] are:
Customer satisfaction by rapid, continuous delivery of useful software
Working software is delivered frequently (weeks rather than months)
Working software is the principal measure of progress
Even late changes in requirements are welcomed
Close, daily cooperation between business people and developers
Face-to-face conversation is the best form of communication (Co-location)
Projects are built around motivated individuals, who should be trusted
Continuous attention to technical excellence and good design
Simplicity
Self-organizing teams
Regular adaptation to changing circumstances
The manifesto spawned a movement in the software industry known as agile software development.
In 2005, Alistair Cockburn and Jim Highsmith gathered another group of people — management experts, this time — and wrote an addendum, known as the PM Declaration of Interdependence
Agile methods are a family of development processes, not a single approach to software development. In 2001, 17 prominent figures[5] in the field of agile development (then called "light-weight methods") came together at the Snowbird ski resort in Utah to discuss ways of creating software in a lighter, faster, more people-centric way. They created the Agile Manifesto, widely regarded as the canonical definition of agile development and accompanying agile principles.
Some of the principles behind the Agile Manifesto[6] are:
Customer satisfaction by rapid, continuous delivery of useful software
Working software is delivered frequently (weeks rather than months)
Working software is the principal measure of progress
Even late changes in requirements are welcomed
Close, daily cooperation between business people and developers
Face-to-face conversation is the best form of communication (Co-location)
Projects are built around motivated individuals, who should be trusted
Continuous attention to technical excellence and good design
Simplicity
Self-organizing teams
Regular adaptation to changing circumstances
The manifesto spawned a movement in the software industry known as agile software development.
In 2005, Alistair Cockburn and Jim Highsmith gathered another group of people — management experts, this time — and wrote an addendum, known as the PM Declaration of Interdependence